中间图

Or

题库搜索>问题求解PS-13359

问题求解PS-13359 【难度:600-650】 Time Cost
收藏
报告题目错误
请选择错误类型:
请描述一下这个错误:

取消

Machine A, operating alone at its constant rate, produces 500 feet of a particular fiber in 2 hours. Machine B, operating alone at its constant rate, produces 500 feet of the same fiber in 3 hours. Machine C, operating alone at its constant rate, produces 500 feet of the same fiber in 5 hours. How many hours will it take machines A, B, and C, operating together at their respective constant rates, to produce 1,000 feet of the fiber?

  • 分析A选项 分析选校图标
    xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
  • 分析B选项 分析选校图标
    xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
  • 分析C选项 分析选校图标
    xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
  • 分析D选项 分析选校图标
    xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
  • 分析E选项 分析选校图标
    xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
暂无雷哥网文字解析
当前版本由 ya**** 更新于2015-12-14 09:41:50 感谢由 ya**** 对此题目的解答所做出的贡献。

V1=500/2,V2=500/3,V3=500/5,T=1000/(500/2+500/3+500/5)=60/31


题目讨论 (0条评论)

用户头像
提交
    题号选择

    科目: 问题求解PS

    • 句子改错SC
    • 逻辑CR
    • 阅读RC
    • 数据充分DS
    • 问题求解PS
    • 综合推理IR

    来源: GWD

    • 全部
    • OG20
    • OG20新题
    • OG19新题
    • OG18新题
    • OG18分册
    • OG17新题
    • OG16
    • OG12
    • 破解版12
    • 破解版08
    • 破解版07
    • GWD
    • 精选题库
    • OG18自测章
    • Manhattan
    • magoosh
    • 难题300
    题目信息

    1m49s

    平均耗时

    91%

    平均正确率

    • 题目来源1:GWD–TN24套

    该题由网友VpXJFSu提供

    点击上传
    • 手机注册
    • 邮箱注册
    登录>







    关闭图标

    标题图

    • 图标

      知识库学习

      GMAT语法、逻辑、阅读、数学各单项备考知识点学习及测验
    • 图标

      在线做题

      包含GMAT各单项必考知识点题目、OG/PREP/GWD/雷哥讲义题目、难度650/680/700/730题库题目练习及题目解析
    • 图标

      在线模考

      语文套题/数学套题/全套仿真模考,包含GWD/PERP/精选模考等上百套套题模考
    • 图标

      在线测评

      适合5种不同基础的GMAT学员,测评后可自动出具分数报告及复习计划指导
    • 图标

      资料下载

      GMAT必备备考资料下载、鸡精下载、课程课件等免费下载
    • 图标

      课程学习

      注册会员后,可在GMAT课程区,选择免费直播课程及公开课程进行在线学习
    ×
    请你选择你要查看的模考成绩单
    立即开通 暂不开通
    加载图片
    网络异常